SOP · Internal Process

Bug Reports & Improvements
to Wappsi

One single channel, one single log, zero uncertainty about the status of each request.

Owner: Pablo Process Internal

★ Objective

Ensure every improvement or problem is documented with enough detail for Wappsi to act quickly, and that the team can see the status of each request without having to ask "so what happened with that?"

1 Single Report Channel

Any team member who finds a bug or has an improvement idea fills out the format below and sends it to Pablo via WhatsApp or email — the channels Wappsi already uses. Do not report directly to Wappsi without going through Pablo, so there's a single coordination and priority point.

Team member detects a bug or improvement
→
Fills out format and sends to Pablo
→
Pablo logs it and contacts Wappsi
→
Status visible to the whole team

2 Required Information Per Report

FieldExample
Date07/15/2026
Reported byName
TypeBug / Improvement / Technical Question
Problem descriptionWhat happened, what was expected
ScreenshotRequired if applicable
Exact URLRequired if applicable
User who experienced itName / seller or buyer account
Urgency (per reporter)High / Medium / Low

3 Central Log

Pablo maintains a sheet (Google Sheet or Notion — to be decided with Kriston) with one row per report:

DateReported byShort DescriptionStatusResponse DateNotes
Sent to Wappsi · In Progress · Resolved · Rejected

This log is visible to the whole team (shared link) — so nobody has to ask Pablo one by one "did they fix X yet?" You can see the status directly.

4 Time Expectations

Wappsi doesn't have a confirmed fixed SLA yet. Pablo's task — tomorrow (07/16/2026): formally ask Wappsi how long improvements/bugs will take once reported, depending on the type of request (critical bug vs. improvement).

Internal communication in the meantime: "Wappsi is responsive, but the time depends on the complexity of the change — we don't promise an exact date until Pablo confirms with them." This prevents the team from assuming a change takes 1 day when it might actually take 2 weeks.

5 Priority Open Tickets — Month 1

1 · Stock/Inventory Behavior Resolved

Stock does get deducted automatically and in real time when a sale occurs. Own-brand inventory (Do Brasil, Uptrend, Hello Kids) syncs with the ERP; external sellers' stock does not sync — and doesn't need to. Gives Laura/Inventory complete peace of mind: nothing to manage there.

1b · Automatic "Out of Stock" Visual Label New

Today, when a product reaches 0 units, it remains visible in the storefront (you can't buy it, but it's not marked either), which confuses the buyer. We'll request Wappsi to add an automatic label. Priority: Medium-High — affects the buying experience, not just aesthetic.

2 · Broken Notifications Pending

Confirm which system notifications are not working (mentioned by the team).

3 · Automatic "New Product Published" Notification Pending

Evaluate feasibility — so CSR knows in real-time when to request verification photos from the seller, without having to manually check the "New Arrivals" page.

4 · Wappsi SLA Tomorrow 07/16

Pablo asks how long improvements will take once reported. Priority: High — it's the foundation for communicating real timelines to the team and reducing the anxiety of "when will this be fixed?"

6 Basic Process Documentation

Pablo documents the platform's basic processes (how to create a product, how to bulk upload, how to customize the store, how to set up payout, how to create coupons, how to request a new category). This documentation has dual use:

  • Serves as an internal knowledge base so CSR doesn't have to reinvent the explanation each time.
  • Reused as content/resources within the seller welcome Email Drip Campaign — each "how to do X" email can link directly to this guide instead of Kriston/Tevin writing it from scratch.

💡 Why This Matters

The team's fear is not that the platform has problems — all platforms do. The fear is not knowing whether something is being fixed. This log solves that: it turns "I don't know what happened with that bug" into "I see it in the sheet, it's been in progress since Tuesday."