# Done check, version 2 Completed: Wednesday, November 4, 2026. Root: `05_projects/2026-11_Catch_Up/` Status: the SFMA work is closed. The Linx IJ470 launch is prepared and on hold. The Tourmaline pattern is a standing rule. The Pack Expo Southeast 2027 plan is ready for confirmation. --- ## What changed from version 1 | Area | Version 1 | Version 2 | |---|---|---| | SFMA email | Ready to send | Sent the morning of November 4 | | SFMA reminder | Planned for November 5 | Skipped by decision | | SFMA social | Ready to post | Live on LinkedIn, Facebook, and Instagram | | Instagram collaboration | Not done | Sent to Standard Bots and SFMA | | Standard Bots pages | Not live | Live: main, Spark, Core, Thor, Bolt, plus homepage and suppliers | | IJ470 product page | Draft copy | Live at /product/linx-ij470 | | IJ375 | To be redirected | Redirects to the IJ470 page, but the status is a 200 meta refresh. A true 301 still needs verification | | 8900 | To be paused | Not in the product sitemap. Old URL returns the homepage. A 301 is approved | | Linx IJ470 email | Ready to send | HOLD until Jovan confirms the machine is available | | Tourmaline pattern | Appendix in the pack | Standing rule plus full playbook in the knowledge base | | Pack Expo | One appendix | Dedicated plan in `05_projects/Pack_Expo_2027/PLAN.md` | | Replies | Five replies | Two main replies plus one optional. Tourmaline email gets no reply | --- ## New knowledge base files | File | Bytes | Contents | |---|---|---| | `01_knowledge_base/rules/Factronics_Event_Email_Blast_Rule.md` | 4,572 | The value-first, gated-form rule for every event and expo blast | | `01_knowledge_base/research-and-notes/Factronics_Event_Expo_Email_Playbook.md` | 10,234 | Tourmaline teardown, five part structure, form spec, 7-email sequence, SFMA case | ## New project file | File | Bytes | Contents | |---|---|---| | `05_projects/Pack_Expo_2027/PLAN.md` | 8,443 | Southeast 2027 primary plan, watchlist, 6-week runway, approval items | ## Updated catch-up files | File | Bytes | Status | |---|---|---| | `00_SOURCE_FACTS.md` | 12,362 | Updated with current status, Standard Bots, Pack Expo dates, redirect corrections | | `DECISIONS_NEEDED.md` | 3,887 | Rebuilt. Open items and resolved items separated | | `HANDOFF_TODAY.md` | 4,440 | Rebuilt for the remaining work only | | `EVENT_DAY_RUNBOOK.md` | 8,138 | Updated for live posts, tagging, and the 8900 answer | | `01_SFMA_Expo/STATUS.md` | 3,013 | New status page | | `01_SFMA_Expo/APPROVAL.md` | 315 | Superseded pointer | | `01_SFMA_Expo/email_blast.md` | 6,276 | Marked SENT, reminder SKIPPED | | `01_SFMA_Expo/social_posts.md` | 11,980 | Marked PUBLISHED with URL placeholders | | `02_Linx_IJ470/STATUS.md` | 2,358 | New hold and activation page | | `02_Linx_IJ470/APPROVAL.md` | 319 | Superseded pointer | | `02_Linx_IJ470/email_blast.md` | 8,442 | Marked HOLD | | `02_Linx_IJ470/social_posts.md` | 10,241 | Marked HOLD | | `03_Website/website_update.md` | 5,543 | Replaced with live-site verification and cleanup | | `03_Website/ij470_product_page.md` | 9,106 | Marked PUBLISHED | | `04_Replies/replies.md` | 5,288 | Rewritten with 2 main replies and 1 optional | | `QA_REPORT.md` | this run | Version 2 QA report | | `DONE_CHECK.md` | this file | Version 2 inventory | | `CHANGELOG.md` | new | Version history | --- ## Verification | Check | Result | |---|---| | Em dashes and en dashes | 0 in the catch-up, rule, playbook, and Pack Expo files | | Banned compliance phrases | 0 | | SFMA registration call to action | 0 | | Linx IJ470 hold applied | Pass | | SFMA reminder marked skipped | Pass | | Tourmaline email replied to | No. The reference is in the SFMA recap | | Pack Expo Southeast prioritized | Pass | | Live IJ470 page | 200 and content verified | | Live Standard Bots pages | 200 and titles verified | | Live IJ375 URL | 200 with a meta refresh. Flagged for a true 301 | | Live 8900 URL | 200 homepage. Flagged for a 301 | --- ## What remains manual 1. Send the SFMA recap to Jovan. 2. Send the Linx IJ470 hold reply. 3. Add the 8900 301. 4. Verify or add the IJ375 301. 5. Remove the stale 8900 FAQ from the IJ470 page. 6. Event-day posts, photos, and the November 6 thank you. 7. Activate the IJ470 launch when Jovan confirms the machine. Everything else is written and ready.